Dreamy Room Level 304

Level 304 guide walkthrough, helping players solve puzzles and explore the wonderful world of Dreamy Room.

Dreamy Room Level 304 Solution Guide

Dreamy Room Level 304 Walkthrough Guide

Difficulty
Advanced
Time Limit
3:30 min
Items Count
84-90 items
Room Type
Transit Hub Station

Dreamy Room Level 304 Room Story

In the heart of a bustling transit hub, travelers from all walks of life intersect at Dreamy Room Level 304. Morning commuters sip coffee at the small café while watching trains glide into the station through curved glass canopies. The warm glow of ceiling lights reflects off polished floors as passengers navigate between the ground floor airport terminal and Floor 2's metro platform. Colorful luggage dots the baggage claim area, each piece carrying stories of journeys yet to unfold. This multilevel transportation sanctuary blends modern efficiency with cozy waiting areas, where wooden benches and turquoise chairs invite weary travelers to rest before their next adventure begins.

Dreamy Room Level 304: Step-by-Step Placement Guide

Step 1. Install Wall and Ceiling Structure

Begin by establishing the foundational wall structure and ceiling framework. Position the walls to form the corner junction that creates the L-shaped layout characteristic of Dreamy Room Level 304. The ceiling should align perfectly with the wall tops, creating the base for the curved glass canopy that will be added later.

Step 2. Lay Down Floor and Brown Flooring

Place the primary floor foundation across the entire lower level, then add the brown flooring section on the elevated Floor 2 platform area. The brown flooring creates a distinct visual separation between the ground level terminal and the upper metro station in Dreamy Room Level 304.

Step 3. Position Large Windows and Glass Panels

Install the window large units along both exterior walls, ensuring the window frame and glass panel components align properly. These windows should span from floor to ceiling on both visible walls, allowing natural light to flood the transit hub and providing views of the exterior environment.

Step 4. Install Elevator System

Place the elevator in the left corner of the ground floor, positioning the elevator door to face the main terminal area. Add the ground floor sign directly above the elevator door to help passengers navigate Dreamy Room Level 304 efficiently.

Step 5. Set Up Luggage Conveyor Belt System

Install the luggage conveyor and conveyor belt in the center-right area of the ground floor. Position the baggage claim system so travelers can easily access their belongings. The belt should run parallel to the waiting area, creating a functional flow pattern.

Step 6. Place Luggage Cart and Suitcases

Position the luggage cart near the baggage claim area with wheels facing forward. Load it with the orange suitcase, green suitcase, pink luggage, and blue luggage. Stack them naturally with the orange suitcase on bottom, creating a realistic luggage arrangement in Dreamy Room Level 304.

Step 7. Install Ticket Booth and Counter

Place the ticket booth and ticket counter against the back wall near the elevator. Position the booth window at the front of the counter, creating a functional service area where passengers can purchase tickets and get information.

Step 8. Set Up Yellow Kiosk Station

Install the kiosk yellow to the left of the elevator, placing it against the wall for stability. This self-service station should be easily accessible for travelers to check in or print boarding passes according to Dreamy Room Level 304 design.

Step 9. Mount Information Screen and Departure Board

Attach the information screen to the wall above the waiting area and position the departure board near the ticket booth. These displays provide essential travel information and should be visible from multiple angles throughout the terminal.

Step 10. Add Potted Plant and Decorative Plant

Place the potted plant next to the yellow kiosk, adding a touch of greenery to soften the industrial feel. Position the decorative plant near the ticket booth area, bringing natural elements into Dreamy Room Level 304's modern transit environment.

Step 11. Install Queue Barriers and Stanchions

Set up the barrier pole system and queue barrier between the waiting area and baggage claim. Connect the stanchion posts with yellow rope to create an organized queuing system. Add caution tape where needed to guide passenger flow.

Step 12. Place Airport Seats and Waiting Chairs

Arrange the airport seats and waiting chairs in the designated waiting area on the ground floor. Position the seat row facing the baggage claim area, ensuring comfortable spacing between seats for passenger convenience in Dreamy Room Level 304.

Step 13. Add Floor Signage

Install the floor sign and directional sign on the ground floor near the elevator and stairs. These wayfinding elements help passengers navigate between the ground floor terminal and Floor 2 metro station efficiently.

Step 14. Build Stairs to Floor 2

Construct the stairs leading from the ground floor to the elevated Floor 2 platform. Ensure proper spacing and alignment with both levels, creating a smooth transition between the airport terminal and metro station areas.

Step 15. Install Metro Train and Components

Position the metro train and subway car on the tracks at Floor 2. Install the train glass windows, train door, and train window components to complete the train assembly for Dreamy Room Level 304.

Step 16. Set Up Station Platform Area

Build the station platform at Floor 2 level, ensuring the platform edge runs parallel to the train tracks. This creates a safe boarding area with clear separation between the waiting zone and train.

Step 17. Mount M Station Sign and Floor Indicator

Attach the M station sign to the exterior wall and install the floor 2 sign above the elevator door. Add the , station number, and floor indicator to complete the station branding.

Step 18. Build Station Entrance and Canopy

Construct the station entrance archway leading to Floor 2. Install the curved ceiling and glass canopy over the platform area, creating an elegant covered waiting space that protects passengers from weather.

Step 19. Place Platform Benches

Position the platform bench and wooden bench along the platform edge at Floor 2. Space them evenly to provide multiple seating options for waiting passengers in Dreamy Room Level 304's metro station.

Step 20. Set Up Café Area with Tables

Place the café table and round table in the designated café zone on Floor 2. Position them near the platform railing to create a comfortable dining area with views of both levels.

Step 21. Arrange Café Seating

Position the café chairs around the tables, including the distinctive turquoise chair, white chair, and wooden chair. Mix and match these seating options to create a welcoming café atmosphere.

Step 22. Install Menu Board and Station Menu

Mount the menu board and station menu on the wall above the café area. These should be clearly visible to customers browsing food options while waiting for their train in Dreamy Room Level 304.

Step 23. Set Up Food Display Area

Arrange the food items display and pastry display near the café counter. Add decorative elements like the cupcake decoration on the counter and the floating donut floating above the station for whimsical charm.

Step 24. Add Food Icon Signage

Place the food icon marker near the café entrance to help passengers quickly locate dining options on Floor 2 of the transit hub.

Step 25. Install Vending and Retail Areas

Set up the vending area near the stairs, positioning the product shelves and storage shelves for easy access. Add the distinctive yellow shelves against the wall for Dreamy Room Level 304's retail display.

Step 26. Arrange Retail Display and Small Shop

Position the retail display near the ground floor waiting area. Set up the small shop kiosk with travel essentials and convenience items accessible to passengers on both levels.

Step 27. Install Station Booth and Blue Box

Place the station booth lower on the ground floor near the waiting area. Position the blue box display prominently on the lower level, creating an eye-catching information or retail point.

Step 28. Add Platform Safety Elements

Install the railing glass and platform railing along the edge of Floor 2. Add the safety barrier between the platform and tracks to ensure passenger safety in Dreamy Room Level 304.

Step 29. Lay Tile Floor Sections

Install the tile floor in designated areas throughout both levels, creating visual separation between functional zones and adding texture to the overall design.

Step 30. Mount Security Camera

Install the security camera on the ceiling or upper wall area, angled to monitor both the ground floor terminal and Floor 2 platform for comprehensive security coverage.

Step 31. Add Hanging Decorations

Suspend the hanging decorations from the ceiling at strategic points, including the floating food items above the café area. These whimsical elements add personality to Dreamy Room Level 304's transit environment.

Step 32. Install Ceiling Lights

Mount the ceiling lights throughout both levels, ensuring even illumination across the terminal and platform areas. Position lights to highlight key areas like the baggage claim and café.

Step 33. Add Wall Panels

Install the wall panels on interior walls to add texture and visual interest. These panels help define different functional zones within the transit hub.

Step 34. Position Structural Columns

Place the column and support pillar at key structural points to support the Floor 2 platform and curved glass canopy. These elements should integrate seamlessly with the overall architecture.

Step 35. Install Train Tracks and Platform Gap

Lay the train tracks along Floor 2 where the metro train sits. Ensure proper spacing for the platform gap between the platform edge and train door for safe boarding in Dreamy Room Level 304.

Tips and Precautions

Precautions

  • Watch for the small floor signs and directional signage near the elevator base - these flat elements are easily overlooked when placing larger furniture pieces and can cause incomplete level completion
  • The curved glass canopy and ceiling structure must be positioned before adding hanging decorations, as the installation order affects whether decorative items properly attach to the overhead framework
  • Multiple luggage pieces stack on the cart in a specific sequence - place the orange suitcase first as the base, then layer green, pink, and blue luggage to avoid items bouncing back
  • The platform gap between the train tracks and platform edge requires precise alignment - drag the train carefully to ensure proper spacing that matches the safety barrier placement
  • Queue barriers with yellow ropes connect between stanchion posts in a specific pattern - install barrier poles first, then attach ropes to avoid connection failures in Dreamy Room Level 304

Practical Tips

  • When placing the glass canopy over Floor 2, drag from the back corner forward to utilize the snap-to-ceiling mechanism, ensuring the curved structure aligns perfectly with support pillars
  • For densely packed café furniture arrangement, place the round table first, then position turquoise chairs at precise angles before adding white and wooden chairs to prevent overlap issues
  • The yellow kiosk and small booth elements snap more easily when dragged from slightly above their final position, allowing gravity assist to settle them into correct alignment
  • Install the metro train by first positioning the subway car on the tracks, then attach train doors and windows - this sequence prevents glass panels from blocking door placement
  • Use the tile floor pattern as a grid reference when spacing airport seats and waiting chairs - each seat row aligns with approximately three tile squares for proper spacing in Dreamy Room Level 304
  • The hanging decorations like floating donuts respond to a gentle upward drag motion - release when you feel the snap-in resistance rather than forcing placement